Current Bid Opportunities
| Project | Bid Date | A/E # | Design Consultant | Invitation to Bid |
|---|---|---|---|---|
| Campus Water Distribution System Upgrades MSU Billings Billings, MT | April 30, 2026 | 2023-03-02 | Sanbell |
Completed Bids
| Bid Name | Bid Date | A/E # | Design Consultant | Results |
|---|---|---|---|---|
|
Mazurek Elevator Modernization |
2022-30-01-02 | SMA Architecture | ||
|
Linfield Hall - Roof Replacement |
April 7, 2026 | 2025-02-07 | Mosaic Architecture | |
|
Montana Hall Fire Systems Upgrade |
April 2, 2026 | 2022-02-06 | Morrison Maierle | |
|
Campus Heating Plant Boiler System Upgrade |
March 26, 2026 | 2022-06-01-01 | Three Rivers Engineering | |
|
State Grain Lab Heating System Upgrades |
March 17, 2026 | 2025-44-01 | Falls Mechanical Services | |
|
Helena AFRC HVAC & TC Upgrades |
March 3, 2026 | 2023-33-19 & 2023-33-19-01 |
GPD Consulting | |
|
Parking Lot Improvements |
February 17, 2026 | 2023-20-02 | Nelson Architects | |
|
SARC Hail Damage Repairs |
February 10, 2026 | 2026-02-02 | Schutz Foss Architects | |
|
Mazurek Elevator Modernization |
December 18,2025 | 2022-30-01-02 | SMA Architecture | |
|
Door Control Systems Upgrade |
December 17, 2025 | 2022-26-01 | Simonsen Architects | |
|
Mazurek Floor Tile Repair |
November 25, 2025 | 2022-30-01-02 | SMA Architecture | |
|
Flathead Lake Biological Station Reroofs |
November 13, 2025 | 2023-01-05 | Mosaic Architecture | |
|
Bart Farm Life-Safety & Programmatic Improvements & Demo |
November 12, 2025 | 2023-02-36 | Slate Architecture | |
|
Kalispell Combination Facility |
November 6, 2025 | 2023-31-02 | CWG Architects | |
|
X Building Fire Alarm Upgrade |
November 5, 2025 | 2023-12-11-01 | Associated Construction Engineering | |
|
D-Wing Renovation |
October 30, 2025 | 2025-19-01 | HGFA Architects | |
|
Parking Structure Repairs - 5 Last Chance Gulch |
October 29, 2025 | 2021-30-02-01 | Morrison Maierle | |
|
Fire Alarm Replacement - Multiple Buildings |
October 14, 2025 | 2023-01-06 | OZ Architects | |
|
Great Falls Combination Facility |
October 7, 2025 | 2023-31-01 | CWG Architecture | |
|
Elevator Repair / Replacement |
September 25, 2025 | 2023-04-04 | Spark Architecture | |
|
DNRC Bunkhouse - Anaconda |
September 17, 2025 | 2023-38-04 | Mosaic Architecture | |
|
DNRC Bunkhouse - Clearwater |
September 17, 2025 |
2023-38-03 |
Mosaic Architecture |
|
|
Great Falls AFRC Exterior Sustainment |
August 27, 2025 |
2023-33-17-08 |
Cushing Terrell |
|
|
Kalispell AFRC & FMS Exterior Sustainment |
August 26, 2025 |
2023-33-17-03 |
Cushing Terrell |
|
|
Replace MCE Laundry Equipment |
August 7, 2025 |
2022-12-03 |
Con'eer Engineering |
|
|
Lambing Barn Renovation & Safety Upgrades |
August 5, 2025 |
2023-02-33 |
Slate Architecture |
|
|
Original Governor's Mansion |
July 30, 2025 |
2023-30-04 |
Lot4 Architecture |
|
|
Rimrock Elevator Renewal |
July 17, 2025 |
2019-03-01 |
Space Planning for People |
|
|
Great Falls Job Service Renovation |
June 25, 2025 |
2023-42-03 |
Nelson Architects |
|
|
Gallatin RC/FMS HVAC & TC Upgrades |
June 17, 2025 |
2023-33-15 & 2023-33-15-01 |
GPD Consulting |
|
|
Central Services Site Upgrades - Phase 1 |
June 12, 2025 | 2023-35-10 |
Bechtle Architects |
|
|
MT State Capitol - Renovation of Legislative Spaces |
May 22, 2025 | 2024-50-02 |
A&E Design |
|
|
DES Warehouse |
May 13, 2025 | 2023-33-21 |
CWG Architecture |
|
|
Northeast Land Office Fire Ready Room |
May 7, 2025 | 2023-38-05 |
HGFA Architects |
|
|
Metals Technology Building Roof |
April 16, 2025 | 2023-05-06 |
Nelson Architects |
|
|
Boiler Replacement - MLEA Administration Building |
April 10, 2025 | 2023-37-03 |
Morrison - Maierle |
|
|
Roof Replacement |
April 9, 2025 | 2023-15-01 |
HGFA Architects |
|
|
Helena AFRC Isolation Valves |
April 2, 2025 | 2023-33-17-01 |
Cushing Terrell |
|
|
Cobleigh Hall Exterior Repairs |
April 1, 2025 | 2023-02-26 |
Mosaic Architecture |
|
|
Emergency Water System & Fixture Upgrade |
March 27, 2025 | 2023-02-28 |
Cushing Terrell |
|
|
Haynes Lab Ventilation Upgrades - Phase 2 |
March 26, 2025 | 2013-02-03-02 |
GPD Architects |
|
|
Campus Building Envelope Repairs - Roof Replacements |
March 20, 2025 | 2023-04-06C |
Kestle Architects |
|
|
Havre RC & Annex Exterior Sustainment |
March 12, 2025 | 2023-33-17-07 |
Cushing Terrell |
|
|
Havre Readiness Center Roof Replacement |
March 11, 2025 | 2023-33-17-11 |
Cushing Terrell |
|
|
Roof Replacement & Upgrades |
March 6, 2025 | 2023-37-04 |
Plan One Architects |
|
|
MCE Food Factory Emergency Generator |
March 5, 2025 | 2019-12-03-03 |
Paradigm 3 Architecture |
|
|
Dorm Flooring Upgrades |
February 25, 2025 | 2023-37-06 |
Plan One Architects |
|
|
Lagoon Cleanout & Restoration |
February 20, 2025 | 2011-11-01-05 |
Anderson Montgomery Consulting Engineers |
|
|
Unit F Sewer Line Replacement |
February 13, 2025 | 2023-15-02 |
Coneer Engineering |
|
|
MBMG PV Solar Install & Lighting Upgrade |
February 12, 2025 | 2024-06-01 |
Cushing Terrell |
|
|
MWP Prison Fence (Bundle #7) |
February 4, 2025 | 2023-26-03 |
HGFA Architects |
|
|
NRB Fire Alarm Upgrade |
January 29, 2025 | 2022-06-03-01 |
CDS Engineering |
|
|
UM Replace Elevators - Rebid |
January 7, 2025 | 2023-01-04 |
HGFA Architects |
|
|
Watch East Deferred Maintenance (Badlands Recovery Center) |
December 19, 2024 | 2023-10-02 |
SDI Architects |
|
|
Clapp Elevator Replacement - Rebid |
December 17, 2024 | 2022-01-04 |
Cushing Terrell |
|
|
UM Replace Elevators |
December 12, 2024 | 2023-01-04 |
OZ Architects |
|
|
Campus Heating Plant Controls Upgrade |
December 12, 2024 | 2023-02-27 |
Cushing Terrell |
|
|
PE Building Roof Replacement |
December 4, 2024 | 2023-03-01 |
Space Planning for People |
|
|
Pershing Hall Renovation |
December 3, 2024 | 2023-05-05 |
Nelson Architects |
|
|
UM Roof Replacements |
November 26, 2024 | 2023-01-14 |
OZ Architects |
|
|
CLO Dispatch Center Expansion |
November 12, 2024 | 2023-38-06 |
Bechtle Architects |
|
|
Heated Storage Unit |
October 29, 2024 | 2023-19-02 |
HGFA Architects |
|
|
BSB Re-Entry Services / Acadia Building - Rebid |
October 24, 2024 | 2023-10-01-01 |
Con'eer Engineering |
|
|
Main Hall Building Roof Replacement (Bundle #7) |
October 23, 2024 | 2023-26-04C |
HGFA Architects |
|
|
UM Replace Electrical Equipment |
October 17, 2024 | 2023-01-07 |
HDR Engineering |
|
|
Harlem Equipment Storage Building - Rebid |
September 12, 2024 | 2022-31-06 |
Nelson Architects |
|
|
Seedling Nursery Capital Improvements |
August 22, 2024 | 2023-38-02 |
Eclipse Architecture |
|
|
Stillwater Unit Shop Replacement |
August 13, 2024 | 2023-38-01 |
Eclipse Architecture |
|
|
Anaconda Bunkhouse |
August 6, 2024 | 2023-38-04 |
Plum Architecture |
|
|
Bus Loop & Parking Lot Updates |
July 24, 2024 | 2023-20-02 |
Nelson Architects |
|
|
Swan Lake Siding Repair |
July 11, 2024 | 2022-38-02 |
Eclipse Architecture |
|
|
MSUN Vande Bogart Library Roof Replacement |
July 9, 2024 | 2022-05-01 |
Nelson Architects |
|
|
MWP Boiler / Chiller Improvements |
June 20, 2024 | 2023-26-01 & 2023-26-02 |
Con'eer Engineering |
|
|
BSB Re-Entry Services / Acadia Building |
June 19, 2024 | 2023-10-01-01 |
Con'eer Engineering |
|
|
MDT Equipment Storage Building |
June 18, 2024 | 2022-31-06 |
Nelson Architects |
|
|
Campus Building Envelope Repairs - Window Replacement |
June 13, 2024 | 2023-04-06B |
Kestle Architects |
|
|
Lincoln Airport SRE Storage Building |
June 11, 2024 | 2022-31-02 |
Robert Peccia & Associates |
|
|
Barnard Hall Chiller Replacement Project |
May 22, 2024 | 2023-02-23 |
Cushing Terrell |
|
|
Roof Replacement - Wings A, D, E & F |
May 21, 2024 | 2022-19-01B |
HGFA Architects |
|
|
MSUN Electronics Tech HVAC & Lighting Upgrades |
May 9, 2024 | 2023-05-04 |
Falls Mechanical Services |
|
|
Campus Fire Sprinkler Upgrades - Phase 2 |
April 25, 2024 | 2022-20-01B |
Cushing Terrell |
|
|
Gallatin Readiness Center Re-Roof |
April 24, 2024 | 2023-33-14 |
Jackola Engineering |
|
|
Fort Harrison HAFRC Lighting Retrofit |
April 18, 2024 | 2023-33-16 |
Tesla Engineering |
|
|
Tower Roof Replacement (Bundle #7) |
April 17, 2024 | 2023-26-04B |
HGFA Architects |
|
|
Fire Suppression System Upgrade |
April 11, 2024 | 2021-07-01-01 |
Clayton Designs |
|
|
UM Stormwater Improvements Project |
April 10, 2024 | 2023-01-02 |
WGM Group |
|
|
Region 6 Glasgow HQ Addition & Meeting Room |
March 28, 2024 | 2019-35-04 |
JGA Architects |
|
|
Rainwater Damage Repair |
March 26, 2024 | 2024-07-01 |
HGFA Architects |
|
|
MSP Water Supply / Distribution Upgrade |
March 21, 2024 | 2020-12-03 |
IMEG Corporation |
|
|
FLBS Replace Sewer Treatment System |
March 20, 2024 | 2016-01-01-02 |
Anderson Montgomery |
|
|
Broadband Upgrade |
March 14, 2024 | 2023-20-01 |
Morrison Maierle |
|
|
MWP Roof Replacement (Bundle #7) |
March 6, 2024 | 2023-26-04A |
HGFA Architects |
|
|
MWP Lighting Upgrade |
February 15, 2024 | 2022-26-02 |
Con'eer Engineering |
|
|
Campus Lighting Upgrade |
February 14, 2024 | 2023-04-01 |
Blacksheep Engineering |
|
|
UM Stone Hall Roof Replacement |
February 6, 2024 | 2022-01-02 |
Hoffman - Morgan & Associates |
|
|
Block Hall Renovation |
January 10, 2024 | 2022-04-03 |
Dowling Architects |
|
|
MDT Wolf Point HQ Office Remodel |
December 21, 2023 | 2021-31-01 |
BSpark Architecture |
|
|
Heating System Upgrades - Phase 3 |
December 20, 2023 | 2022-06-01 |
Three Rivers Engineering |
|
|
Montana Historical Society FFE |
December 19, 2023 | 25-14-01 |
Cushing Terrell |
|
|
SCU Garden ADA Upgrade - Rebid |
December 19, 2023 | 2022-18-01 |
Jackola Architecture & Engineering |
|
|
Billings Welding Shop / Tow Plow Storage - Rebid |
November 15, 2023 | 2022-31-08 |
Simonsen Architect |
|
|
Roof Replacement |
November 7, 2023 | 2022-18-03 |
Jackola Architecture & Engineering |
|
|
Campus Storage / Warehouse Building |
November 2, 2023 | 2022-04-03-01 |
Dowling Architects |
|
|
Liquor Warehouse Expansion |
October 12, 2023 | 2022-34-01 |
CWG Architects |
|
|
SCU Garden ADA Upgrade |
October 5, 2023 | 2022-18-01 |
Jackola Architecture & Engineering |
|
|
MVH Flooring Replacement - Rebid |
September 28, 2023 | 2022-18-02 |
Jackola Architecture & Engineering |
|
|
Reid Hall Fire System Upgrade |
September 21, 2023 | 2022-02-01 |
Coffman Engineers |
|
|
MVH Flooring Replacement |
September 7, 2023 | 2022-18-02 |
Jackola Engineering |
|
|
Donaldson HVAC Upgrade - Rebid #2 |
August 31, 2023 | 2022-07-01 |
Millenium Engineering |
|
|
MLEA - Scenario Training Building |
August 30, 2023 | 2022-37-01 |
Architects Alaska |
|
|
EMVH Laundry Improvements |
August 24, 2023 | 2023-25-01 |
Con'eer Engineering |
|
|
Old Board of Health Building Renovation |
August 16, 2023 | 2022-30-01-03 |
SMA Architecture |
|
|
Mazurek Building Renovation |
August 2, 2023 | 2022-30-01-02 |
SMA Architecture |
|
|
Wet Skid Pad Resurface Project |
July 6, 2023 | 2022-45-01 |
WWC Engineering |
|
|
Brockmann HVAC / Energy Upgrades - Rebid |
June 15, 2023 | 2022-05-02 |
Falls Mechanical Services |
|
|
State of MT Combined Labs |
June 15, 2023 | 2020-47-01-01 |
LPW Architecture |
|
|
Auto Tech System Improvements |
June 14, 2023 | 2022-05-04 |
Falls Mechanical Services |
|
|
Eastern Land Office |
June 1, 2023 | 2022-38-01 |
SDI Architects & Design |
|
|
Chancellor's House Roof Replacement |
May 18, 2023 | 2022-04-01B |
Kestle Architects |
|
|
Havre Welding Shop |
May 11, 2023 | 2022-31-01 |
Simonsen Architect |
|
|
Billings Welding Shop / Tow Plow Storage |
May 10, 2023 | 2022-31-08 |
Simonsen Architect |
|
|
Yellowstone WYS Civil |
May 9, 2023 | 2020-31-04 |
Morrison-Maierle |
|
|
SARC Hail Damage Repairs |
May 9, 2023 | 2023-02-12 |
Schutz Foss Architects |
|
|
Legislative Chambers Carpeting - Rebid |
May 4, 2023 | 2020-30-01-02 |
Hennebery Eddy Architects |
|
|
Mechanical Systems Improvements |
May 4, 2023 | 2022-18-04 |
Morrison Maierle |
|
|
Dining Hall Renovation |
April 19, 2023 | 2022-04-02 |
Loci Architecture & Design |
|
|
State Health Lab Renovation |
April 6, 2023 | 2022-40-01 |
LPW Architecture |
|
|
MBMG Rock Specimen Storage Facility |
April 4, 2023 | 2023-06-01 |
Kevin Krebsbach |
|
|
Phillipsburg Equipment Storage Building |
March 22, 2023 | 2022-31-03 |
Slate Architecture |
|
|
Custer Equipment Storage Building |
March 9, 2023 | 2022-31-07 |
SDI Architects & Design |
|
|
White Sulphur Springs Equipment Storage Building |
March 8, 2023 | 2022-31-05 |
Slate Architecture |
|
| Facility Improvements - Interior Eastern Montana Veterans' Home |
March 7, 2023 | 2022-25-02 |
SDI Architects & Design |
|
| Facility Improvements - Exterior Eastern Montana Veterans' Home |
March 7, 2023 | 2022-25-01 |
SDI Architects & Design |
|
|
Heating System Upgrades - Phase 2 |
March 2, 2023 | 2022-06-01 |
Three Rivers Engineering |
|
|
Soccer Field Turf Replacements |
February 28, 2023 | 2023-07-01 |
Sanderson Stewart |
|
|
Terry Equipment Storage Building |
February 23, 2023 | 2022-31-04 |
SDI Architects & Design |
|
|
Clapp Building Elevator Modernization |
February 21, 2023 | 2022-01-04 |
Cushing Terrell |
|
|
Wolf Point HQ Office Remodel - REBID |
February 16,2023 | 2021-31-01 |
BSpark Architecture |
|
|
School of Cosmetology |
December 20, 2022 | 2022-07-02 |
Slate Architecture |
|
|
Bitterroot Lift |
December 15, 2022 | 2022-20-02 |
Nelson Architects |
|
|
Campus Fire Sprinkler Upgrades - Bitterroot Building |
December 8, 2022 | 2022-20-01 |
Cushing Terrell |
|
|
MLC Sewer & Water System Improvements |
November 17, 2022 | 2019-45-01-01 |
Casne & Associates |
|
|
Mansfield Library Roof Replacement - Rebid |
November 16, 2022 | 2022-01-03 |
Gavin Hanks Architects |
| Project | Budget | Agency | Location | Anticipated Bid Date |
|---|---|---|---|---|
| Anaconda Bunkhouse | $1,180,962 | Natural Resources | Anaconda | |
| Energy Improvements and Generator Backup | $320,250 | Military Affairs | Belgrade | |
| Billings AFRC Unheated Storage | $92,416 | Military Affairs | Billings | |
| Billings Readiness and Innovation Campus | $12,840,000 | Military Affairs | Billings | |
| Billings UI Call Center Repairs | $1,000,000 | Labor & Industry | Billings | |
| Campus Water Distribution System Upgrades | $2,400,000 | MSU - Billings | Billings | |
| Door Control Systems MWP | $150,000 | Corrections | Billings | |
| Facility LED Lighting Retrofit | $238,816 | Military Affairs | Billings | |
| Mark and Robyn Jones MSU College of Nursing | $18,400,000 | Montana State University | Billings | |
| MWP Cooling System Upgrade | $750,000 | Women's Prison | Billings | |
| MWP Heating System Upgrade | $1,500,000 | Women's Prison | Billings | |
| MWP Perimeter Fence/Dog Yard | $1,000,000 | Women's Prison | Billings | |
| MWP Roof Replacement | $5,000,000 | Women's Prison | Billings | |
| P.E. Building Roof Replacement | $2,400,000 | MSU - Billings | Billings | |
| Boulder Dorm Renovations | $250,000 | Highway Patrol | Boulder | |
| Roof Replacement- MHP Boulder Campus | $1,860,000 | Highway Patrol | Boulder | |
| Ag Ananlytical (Combined Labs) | $3,858,000 | Montana State University | Bozeman | |
| Barnard Hall Cooling System Repair & Improvements | $1,750,000 | Montana State University | Bozeman | |
| BART Demolition Project | $450,000 | MAES BART | Bozeman | |
| BART Life-Safety & Programmatic Improvements | $10,000,000 | MAES | Bozeman | |
| Campus Heating Plant Boiler Controls Upgrade | $2,400,000 | Montana State University | Bozeman | |
| Cobleigh Hall Parapet Structural Repair | $2,400,000 | Montana State University | Bozeman | |
| Emergency Water System & Fixture Upgrades | $2,400,000 | Montana State University | Bozeman | |
| Gallatin RC & FMS HVAC & Controls Repairs | $1,282,988 | Military Affairs | Bozeman | |
| Gallatin Readiness Center Roof Replacement | $1,482,910 | Military Affairs | Bozeman | |
| Gianforte Hall MSU Computing Building | $50,000,000 | Montana State University | Bozeman | |
| Hamilton Hall Life-Safety System Improvements | $2,400,000 | Montana State University | Bozeman | |
| Haynes Hall Ventilation Upgrades | $3,400,000 | Montana State University | Bozeman | |
| Lambing Barn Renovation & Safety Upgrades | $2,000,000 | MAES | Bozeman | |
| Lewis Hall ADA Upgrades | $2,400,000 | Montana State University | Bozeman | |
| Lewis Hall Code & Instructional Renovations | $31,500,000 | Montana State University | Bozeman | |
| Mark and Robyn Jones MSU College of Nursing | $18,400,000 | Montana State University | Bozeman | |
| MSU Facilities Yard Relocation | $8,000,000 | Montana State University | Bozeman | |
| MSU Indoor Practice Facility | $15,000,000 | Montana State University | Bozeman | |
| Reid Hall Fire System Upgrades | $1,000,000 | Montana State University | Bozeman | |
| Tietz Hall Roof Replacement | $1,300,000 | Montana State University | Bozeman | |
| Vet Diagnostic Lab (Combined Labs) | $2,200,000 | Livestock | Bozeman | |
| Visual Communications Building PBS Addition | $4,000,000 | Montana State University | Bozeman | |
| Wool Lab (Combined Labs) | $4,700,000 | Montana State University | Bozeman | |
| Electrical Distribution - Multiple Bldgs | $650,000 | UM Tech | Butte | |
| Engineering Hall Full Interior Renovations | $8,000,000 | UM Tech | Butte | |
| Heating Systems Upgrade | $2,750,000 | UM Tech | Butte | |
| Highlands College Indoor Pole Barn | $2,000,000 | Highlands College | Butte | |
| Main Hall Remodel and Renovation | $30,000,000 | UM Tech | Butte | |
| Masonry Repairs - Plaster, Tuckpointing, Flat | $455,000 | UM Tech | Butte | |
| Restroom Renovations | $1,200,000 | UM Tech | Butte | |
| Silver Bow Readiness Center | $13,713,049 | Military Affairs | Butte | |
| SW MVH Cottage Connectors | $5,250,000 | SW MT Veterans Home | Butte | |
| MVH ARPA Mechanical Upgrade | $423,039 | Veterans Home | Columbia Falls | |
| MVH Flooring Project | $367,000 | DPHHS | Columbia Falls | |
| MVH Roof Replacement | $1,600,000 | DPHHS | Columbia Falls | |
| Special Care Unit Courtyard Improvements | $517,000 | DPHHS | Columbia Falls | |
| WTARC Research Labs | $320,810 | MAES | Conrad | |
| WARC Shop Renovation & Safety Upgrades | $600,000 | MAES WARC | Corvallis | |
| MCE Food Factory Emergency Generator | $100,000 | Correctional Enterprises | Deer Lodge | |
| MCE Motor Vehicle Blg: Ventilation and Paint & Sandblasting Booths | $590,000 | Correctional Enterprises | Deer Lodge | |
| MCE Industries Repairs | $700,000 | Correctional Enterprises | Deer Lodge | |
| MSP Check Point Bldg / Wallace Entry Security Enhancements | $3,000,000 | MT State Prison | Deer Lodge | |
| MSP Entry/Staff Services Addition to Wallace Building | $12,800,000 | MT State Prison | Deer Lodge | |
| MSP New Multi-Purpose Programs Building | $9,000,000 | MT State Prison | Deer Lodge | |
| MSP Perimeter Fence Enhancement | $1,500,000 | MT State Prison | Deer Lodge | |
| MSP Red Light/Emergency Notification System | $1,000,000 | MT State Prison | Deer Lodge | |
| MSP Replace Low-Side Housing | $135,000,000 | MT State Prison | Deer Lodge | |
| MSP Replace Roofs | $5,600,000 | MT State Prison | Deer Lodge | |
| MSP Site Infrastructure Study | $300,000 | MT State Prison | Deer Lodge | |
| MSP Unit F Water Supply Upgrade | $600,000 | MT State Prison | Deer Lodge | |
| MSP Water Line Replacement | $3,000,000 | MT State Prison | Deer Lodge | |
| Block Hall Renovation | $3,600,000 | UM - Western | Dillon | |
| Campus Building Envelope Repairs | $415,000 | UM - Western | Dillon | |
| Campus Storage/Warehouse Building | $1,250,000 | UM - Western | Dillon | |
| Elevator Repair/Replacement | $325,000 | UM - Western | Dillon | |
| Repair/Replace Sewer Mains | $425,000 | UM - Western | Dillon | |
| Building 1005 Expansion and Compound Upgrades | $713,700 | Military Affairs | Ft Harrison | |
| Building 530 Compound Improvements | $526,125 | Military Affairs | Ft Harrison | |
| Collective Training Housing Facility | $3,000,000 | Military Affairs | Ft Harrison | |
| Crew Proficiency Course Tower Improvements | $396,934 | Military Affairs | Ft Harrison | |
| Fort Harrison Lighting Upgrades Bldg 1001 | $141,062 | Military Affairs | Ft Harrison | |
| Fort Harrison Lighting Upgrades Bldg 1003 | $141,063 | Military Affairs | Ft Harrison | |
| Fort Harrison Lighting Upgrades Bldg 1011 | $141,062 | Military Affairs | Ft Harrison | |
| Fort Harrison Lighting Upgrades Bldg 1020 | $141,063 | Military Affairs | Ft Harrison | |
| HAFRC Lighting and Control Modifications | $351,715 | Military Affairs | Ft Harrison | |
| Maintenance Shop HVAC and Controls Upgrade | $1,486,733 | Military Affairs | Ft Harrison | |
| Ready Building Addition | $4,700,000 | Military Affairs | Ft Harrison | |
| Training Equipment Site HVAC & Controls Upgrade | $569,969 | Military Affairs | Ft Harrison | |
| Training Site HVAC and Controls Upgrade | $2,574,002 | Military Affairs | Ft Harrison | |
| Glasgow Headquarters | $3,100,000 | Fish Wildlife & Parks | Glasgow | |
| Eastmont HVAC System Repairs/Replacements | $200,000 | Corrections | Glendive | |
| Makoshika Campground Improvement & Addition | $5,000,000 | Fish Wildlife & Parks | Glendive | |
| Campus Security Camera Install | $300,000 | School for the Deaf & Blind | Great Falls | |
| Combination Facility Great Falls | $12,600,000 | Transportation | Great Falls | |
| Create Bus Loop and Update Parking Lot | $349,637 | School for the Deaf & Blind | Great Falls | |
| Fire Suppression System Upgrades | $500,000 | Great Falls College | Great Falls | |
| Job Service Great Falls Building Renovation | $5,767,880 | Labor & Industry | Great Falls | |
| Mark and Robyn Jones MSU College of Nursing | $18,400,000 | Montana State University | Great Falls | |
| Sprinkler Systems - Mustang Center & Dining | $830,854 | School for the Deaf & Blind | Great Falls | |
| Clearwater Replacement Bunkhouse | $1,189,178 | Natural Resources | Greenough | |
| Brockmann Center HVAC & Energy Upgrades | $1,907,320 | MSU - Northern | Havre | |
| Campus EMS Building Controls Upgrade Project | $400,000 | MSU - Northern | Havre | |
| Electronics Tech HVAC & Lighting Upgrade | $800,000 | MSU - Northern | Havre | |
| Havre Area Office | $2,820,000 | Fish Wildlife & Parks | Havre | |
| Havre Unheated Building | $126,636 | Military Affairs | Havre | |
| Metals Technology Building Roof Project | $400,000 | MSU - Northern | Havre | |
| NARC Research Labs | $320,810 | MAES | Havre | |
| Pershing Hall Renovation | $2,400,000 | MSU - Northern | Havre | |
| Vande Bogart Library Roof Replacement | $675,000 | MSU - Northern | Havre | |
| 5 Last Chance Gulch Atrium Renovation | $15,558,029 | Administration | Helena | |
| Acquire and Renovate Airport Hangar | $3,600,000 | UM Helena College | Helena | |
| Art Instruction Renovation | $162,500 | UM Helena College | Helena | |
| Aviation Facility HVAC & Temperature Control Upgrade | $3,580,365 | Military Affairs | Helena | |
| Aviation Support Facility Energy Improvements | $1,067,500 | Military Affairs | Helena | |
| Beartooth WMA Facilities Upgrade | $8,000,000 | Fish Wildlife & Parks | Helena | |
| Boiler & Chiller Replacement - Walt Sullivan | $473,707 | Administration | Helena | |
| Boiler Replacement - MLEA Admin Building | $830,000 | Law Enforcement Academy | Helena | |
| Central Services Site Upgrades | $17,168,330 | Fish Wildlife & Parks | Helena | |
| CLO Dispatch Center Expansion | $545,000 | Natural Resources | Helena | |
| Cosmetology Program Renovation | $2,495,000 | UM Helena College | Helena | |
| DOC Develop Facility Specific Program & Master Plan | $600,000 | Corrections | Helena | |
| Elevator Modifications - Cogswell Building | $768,757 | Administration | Helena | |
| Elevator Modifications-Walt Sullivan Building | $379,763 | Administration | Helena | |
| FCA Baseline Assessments | $1,500,000 | Administration | Helena | |
| Helena Readiness HVAC & Temp Control Upgrade | $3,340,668 | Military Affairs | Helena | |
| Liquor Warehouse Expansion | $14,315,750 | Revenue | Helena | |
| Maintenance, Repair and Small Projects | $3,000,000 | Transportation | Helena | |
| Mazurek Building Renovation | $5,000,000 | Administration | Helena | |
| MT Wild Avian Rehab Bldg | $550,000 | Fish Wildlife & Parks | Helena | |
| Old Board of Health Renovation | $3,500,000 | Administration | Helena | |
| Original Governor's Mansion Repairs | $600,000 | Administration | Helena | |
| Parking Garage Repairs - 5 Last Chance Gulch | $1,808,145 | Administration | Helena | |
| Project Management & Supervision | $2,000,000 | Administration | Helena | |
| Renovation of Capitol Complex Offices ROWS | $50,000,000 | Administration | Helena | |
| Roof & Mechanical - DPHHS 111 N. Sanders St. | $1,309,099 | Administration | Helena | |
| Roof Replacement - FWP Headquarters | $289,695 | Administration | Helena | |
| Site Maintenance Upgrades & Improvements | $7,536,200 | Fish Wildlife & Parks | Helena | |
| State Capitol Building Improvements | $26,316,458 | Administration | Helena | |
| State Disaster Warehouse | $5,704,000 | Military Affairs | Helena | |
| State Emergency Coordination Center Expansion | $6,581,000 | Military Affairs | Helena | |
| State Health Lab Renovation | $7,000,000 | Health & Human Services | Helena | |
| SARC Research Labs | $320,810 | MAES | Huntley | |
| Combination Facility Kalispell | $11,000,000 | Transportation | Kalispell | |
| Mark and Robyn Jones MSU College of Nursing | $18,400,000 | Montana State University | Kalispell | |
| NWARC Research Labs | $320,810 | MAES | Kalispell | |
| Lewistown Area Office | $4,000,000 | Fish Wildlife & Parks | Lewistown | |
| MMHNCC Backup Water Well | $200,000 | Mental Health Nursing Care Center | Lewistown | |
| MMHNCC Heated Storage Unit | $720,000 | Mental Health Nursing Care Center | Lewistown | |
| MMHNCC Key Card Entry System | $125,000 | Mental Health Nursing Care Center | Lewistown | |
| MMHNCC Roof Replacement | $1,500,000 | Mental Health Nursing Care Center | Lewistown | |
| MMHNCC Site Improvements & Increase Parking | $300,000 | Mental Health Nursing Care Center | Lewistown | |
| NELO Fire Ready Room | $445,491 | Natural Resources | Lewistown | |
| Lincoln Airport SRE Building | $250,000 | Transportation | Lincoln | |
| Door Control Systems Pine Hills | $150,000 | Corrections | Miles City | |
| ELO Facilities & Shop | $2,180,235 | Natural Resources | Miles City | |
| Pine Hills Roof Replacement | $1,000,000 | Pine Hills YCF | Miles City | |
| Pine Hills Unit F Sewer Line Replacemet | $500,000 | Pine Hills YCF | Miles City | |
| Adams Center - Student Athlete Locker Rooms | $6,000,000 | University of Montana | Missoula | |
| Campus Wide Classroom Upgrades | $6,000,000 | University of Montana | Missoula | |
| Clapp Building Elevator Modernization | $500,000 | University of Montana | Missoula | |
| Clapp Building Renovation | $37,000,000 | University of Montana | Missoula | |
| Combination Facility Missoula | $10,500,000 | Transportation | Missoula | |
| Liberal Arts Building / Eck Hall | $4,000,000 | University of Montana | Missoula | |
| Mansfield Library Remodel | $4,000,000 | University of Montana | Missoula | |
| Mansfield Library Roof Replacement | $500,000 | University of Montana | Missoula | |
| Mark and Robyn Jones MSU College of Nursing | $18,400,000 | Montana State University | Missoula | |
| Missoula Crime Lab Expansion Feasibility Study | $75,000 | Justice | Missoula | |
| Priority 1 Roof Replacements | $2,425,000 | University of Montana | Missoula | |
| Replace Electrical Equipment | $325,000 | University of Montana | Missoula | |
| Replace Fire Alarms - Clapp Building | $780,000 | University of Montana | Missoula | |
| Seedling Nursery Capital Investment | $2,797,320 | Natural Resources | Missoula | |
| Stone Hall Roof Replacement | $800,000 | University of Montana | Missoula | |
| Upgrade/Replace Elevators | $2,498,650 | University of Montana | Missoula | |
| CARC Research Lab | $320,810 | MAES | Moccasin | |
| Stillwater Unit Shop | $1,214,837 | Natural Resources | Olney | |
| Agency Staff Housing | $7,500,000 | Fish Wildlife & Parks | Statewide | |
| Energy Improvements, Statewide | $3,700,000 | Environmental Quality | Statewide | |
| Signage & Wayfinding Updates | $2,500,000 | Fish Wildlife & Parks | Statewide | |
| Swan Unit Office Siding and Weather Barrier | $187,687 | Natural Resources | Swan Lake | |
| Door Control Systems Xanthopoulos | $150,000 | Corrections | Warm Springs | |
| MSH All Compliance Upgrades for Recertification & Deferred Maintenance | $15,903,000 | DPHHS | Warm Springs | |
| MSH Main Building Roof Replacement | $800,000 | State Hospital | Warm Springs | |
| MSH Waste Water Treatment System Repairs | $1,400,000 | DPHHS | Warm Springs | |
| Xanthopoulos Building Repairs | $2,950,000 | Corrections | Warm Springs | |
| Yellowstone Airport Terminal | $9,000,000 | Transportation | West Yellowstone | |
| FLBS Roof Replacements | $262,000 | Flathead Bio Station | Yellow Bay | |
| FLBS Sewer Treatment Plant | $1,100,000 | Flathead Bio Station | Yellow Bay | |
| FLBS Water and Sewer Systems | $2,500,000 | Flathead Bio Station | Yellow Bay |
A&E uses eMACS (electronic Montana Acquisition & Contracting System) to solicit proposals and qualifications. Click on the tile at right to get more information about eMACS and to register.
View current and past RFQs & RFPs. Type in Architecture & Engineering Division in the Work Group Filter box, then click Search.
Current RFQ / RFP Submissions
| Project | Location | AE Number | Doc |
|---|---|---|---|
|
RFQ for A/E Services |
BILLINGS, MT |
2026-33-03 |
|
|
RFQ for A/E Services |
FORT HARRISON, MT |
2026-33-04 |
|
|
RFQ for A/E Services |
FORT HARRISON, MT | 2026-33-05 |
Consultants
Consultant Selection Process:
Selection Process
Project with a design fee < $50,000 MCA 18-8-212
Projects with a design fee > $50,000 and a project cost ≤ $2,500,000 MCA 18-2-112
Projects with a cost > $2,500,000* MCA 18-2-112
* This amount is slightly flexible. Straightforward projects marginally above this amount may receive consideration to revert to the process described in paragraph 4 while more complex smaller projects may follow the interview process.
Minimum Criteria for Firm Selection
- Qualifications of professional personnel
- Location of firm
- Capability to meet time and budget
- Present and projected workload
- Related experience on similar projects
- Recent and current work for the agency
Additional Information
Energy performance, design-build, and MCA 20-25-309 contracts are exempt from this selection process. This process does not include investigation or construction-related services that do not constitute the practice of architecture, engineering, or land surveying.
After a firm has been selected or appointed, the agency and A&E project manager will review the initial project information and anticipated scope of services with the selected consultant, request a fee for agreed services, and negotiate a contract. If an agreement cannot be reached, negotiations will be terminated, and the Director may appoint one of the remaining two recommended firms.
For Delegated projects, delegation will be granted after a firm is appointed. The agency will then negotiate a contract with the selected firm.
Consultants who wish to be considered for projects $2,500,000 and under must provide information using the Consultant Registration Portal. Access the registration portal.
Three firms will be short-listed on a per-project basis (or grouping of similar projects) and submitted to the director of the Department of Administration for appointment.
Consultants with multiple locations should submit a form for each location.
Consultant information is required to be updated and resubmitted in January of even numbered years. An email will be sent to the email address of the user who submitted the information to update and resubmit their information.
Contact Steve Faherty with any questions:
sfaherty@mt.gov
(406) 422-2080
NOTE: Adobe Dynamic PDF Forms must be opened in Acrobat Reader or Acrobat Pro. These forms allow additional lines to be added dynamically. By default, Windows opens PDFs in a browser but this type of PDF cannot be opened in a browser and you will get a "Please Wait" message. The file must be downloaded to your computer and opened directly with Acrobat.
Dynamic PDFs cannot be edited in Bluebeam. You will get calculation errors and other unexpected results.
If you need assistance, contact Steve Faherty, (406) 422-2080.
Consultant Forms
| Document | Description | Download |
|---|---|---|
|
Boilerplate Request |
Provide information for A&E to compile the specification boilerplate information. (Dynamic PDF - See Note Above) |
|
|
Form 105 |
Architect/Engineer Personnel Rate Schedule |
|
| Form 108 | Consultant Request for Payment (Dynamic PDF - See Note Above) | |
| Form 115 | Statement of Qualifications for Specific Projects | Word |
| Form 117 | Architect/Engineer Fee Proposal | |
| Form 117 Cx | Commissioning Fee Proposal | |
| Insurance Limits | Guidelines for Architects, Engineers & Consultants Insurance Limits | |
| Owner's Basic Requirements | Referenced in AE Contracts. Revised March 2019 | |
| Performance & Document Requirements | Part of the Standard Form of Agreement Effective Date: 10/30/2023 | |
| Record Documents | Requirements and submittal instructions | |
| Title Block Requirements | Information to include on drawing title blocks. |
NOTE: Adobe Dynamic PDF Forms must be opened in Acrobat Reader or Acrobat Pro. These forms allow additional lines to be added dynamically. By default, Windows opens PDFs in a browser but this type of PDF cannot be opened in a browser and you will get a "Please Wait" message. The file must be downloaded to your computer and opened directly with Acrobat.
If you need assistance, contact Steve Faherty, (406) 422-2080.
Contractors
NOTE: Adobe Dynamic PDF Forms must be opened in Acrobat Reader or Acrobat Pro. These forms allow additional lines to be added dynamically. By default, Windows opens PDFs in a browser but this type of PDF cannot be opened in a browser and you will get a "Please Wait" message. The file must be downloaded to your computer and opened directly with Acrobat.
Dynamic PDFs cannot be edited in Bluebeam. You will get calculation errors and other unexpected results.
If you need assistance, contact Steve Faherty, (406) 422-2080.
Construction Forms
| Document | Description | Download |
|---|---|---|
| Form 100 |
Schedule of Amounts for Contract Payment (Dynamic PDF - See Note Above) |
|
| Form 101 | Periodic Estimate for Partial Payment (Dynamic PDF - See Note Above) | |
| Form 101 Instructions | Explanation of all fields and the use of the Recalculate button | |
| Form 102 | Acknowledgement of Subcontractors (Dynamic PDF - See Note Above) | |
| Form 103 | Consent of Surety to Final Payment | |
| Form 104 | Contract Change Order | |
| Form 106 | Affidavit of Completion Release of Liens | |
| Form 107 | Certificate of Substantial Completion | |
| Form 109 | Construction Change Directive | |
| Form 111 | Request for Information | |
|
Form 112 |
Performance Bond | |
| Form 113 | Payment Bond | |
| Form 116 | Lien Release Form | |
| Form 118 | Certificate of Final Acceptance | |
| Form 120 | Agreement for Deposit of Obligations Other Than Retainage | |
| Form 121 | Warranty Defect Notice | |
| Buy-Safe Montana | ||
| Construction Contracting Requirements | Revised May 2023 | |
| General Conditions of the Contract for Construction | Revised November 2023 |
NOTE: Adobe Dynamic PDF Forms must be opened in Acrobat Reader or Acrobat Pro. These forms allow additional lines to be added dynamically. By default, Windows opens PDFs in a browser but this type of PDF cannot be opened in a browser and you will get a "Please Wait" message. The file must be downloaded to your computer and opened directly with Acrobat.
If you need assistance, contact Steve Faherty, (406) 422-2080.
State Agencies
Long-Range Building Program
The Long-Range Building Program is the process through which state agencies and universities request funding for Major Repair and Capital Development projects.
Agencies submit project requests through the LRBP Submission Portal, which opens on October 1 of odd-numbered years and closes on March 31 of even-numbered year.
After the portal closes, the A&E Division reviews and evaluates requests in coordination with the Office of Budget and Program Planning (OBPP). Each project is reviewed for feasibility, alignment with agency needs, and potential increases in operating costs.
All eligible projects are then compiled into a single list of prioritized statewide requests and submitted to the Governor for review prior to October 1 of even-numbered years.
During the first week of each legislative session, the Governor submits the executive budget to the Legislature. This includes the comprehensive long-range building program covering all agency requests.
LRBP 65th Legislative Session FY 2018-2019
LRBP 66th Legislative Session FY 2020-2021
LRBP 67th Legislative Session FY 2022-2023
New Requirement: 6-Year Plan
In addition to project submissions, each agency and university must now prepare a 6-Year Capital Improvement Plan as required under Section 17-7-202, MCA (as amended by HB 5, 2025 Session).
The 6-Year Plan strengthens statewide capital planning by:
- Identifying major repair and capital development projects early.
- Ensuring projects are scheduled for the appropriate legislative session.
- Establishing a clear priority framework for each agency.
- Supporting the Governor’s budget recommendations and the LRBP bill.
Agencies must submit their 6-Year Plan to A&E by April 1 of the year preceding the legislative session. These plans are integrated into the statewide LRBP process to provide the Legislature with a consistent view of long-term facility needs.
Start your agency’s LRBP request process through the LRBP Submission Portal by clicking the tile to the right. You can enter projects even if details are incomplete and continue updating them until the March 31st deadline.
New this cycle: Agencies must also submit a 6-Year Capital Development Facilities Strategic Plan as required by Section 17-7-202, MCA. This plan identifies and prioritizes future capital needs and is due to A&E by April 1 of the year preceding the legislative session.
Submission Portal Instructions
6-Year Plan Template & Instructions - New requirement for the 70th Session
Project Cost & Escalation Calculator
Long Range Building Program Submission Portal
For questions or help with the Submission Portal, contact Steve Faherty, (406) 422-2080
FAQ
What is the 6-Year Capital Improvement Plan and Why is it Required?
The 6-Year Plan is a strategic planning tool that helps agencies and universities identify, prioritize, and schedule capital projects over a multi-year horizon. It supports long-term facility planning, aligns investments with agency goals, and strengthens funding requests by demonstrating proactive planning. As required by Section 17-7-202, MCA (as amended by House Bill 5, 2025 Session), all agencies must submit this plan to the A&E Division by April 1 of the year before the legislative session. Notably, capital development projects (excluding major repairs over $2.5 million) cannot be included in the statewide LRBP submission unless they are part of an agency’s 6-Year Plan—unless an exception is granted by the Office of Budget and Program Planning.
How Do I Submit the 6-Year Capital Improvement Plan?
- One plan is required for each agency.
- Email the completed plan to Steve Faherty sfaherty@mt.gov
- You will receive email confirmation that the plan has been received.
When Can I Start Entering Projects?
October 1st of odd numbered years through March 31st of even numbered years.
I Am Unsure if a Project is Eligible for LRBP Funding. Should I Still Submit it?
Eligibility Criteria
- The building must be owned by a state agency and:
- Operated and maintained with state general fund money, or
- Support academic missions of the Montana University System and be funded with unrestricted university funds.
- Projects entirely funded by special revenue, federal funds, or proprietary funds are not eligible
If you are unsure, contact A&E to help determine if the project is eligible.
Can I Input a Project Even if I Don’t Have Complete Information?
Yes. There are only a few required fields to begin a submission: Agency, Project Title, Location, Project description, and Project cost all that is required. You can always return to the project and add information.
Who Can Submit Projects?
Anyone within your agency can create an account and enter projects. A&E will review all projects with your agency after the March 31st deadline to verify which projects should be in the final submission.
When is the Deadline for Project Submissions?
March 31st of even numbered years.
Can I See All the Projects That Have Been Submitted by My Agency?
You can only view projects submitted under your own account.
If needed, A&E can provide a full list of your agency’s in-progress submissions upon request.
We can also transfer submissions between users. If you need to reassign a project or consolidate submissions under one account, just contact A&E and we’ll take care of it.
The Department of Administration, through the Architecture & Engineering Division, establishes High-Performance Building Standards for the construction, renovation, and maintenance of public buildings in Montana as well as all new state-leased buildings.
High-Performance Building Standards are required for all new buildings and major renovations approved by the Legislature through the Long-Range Building Program.
A “Major Renovation” is a project which will increase the capacity, effect a major change in use, increase the efficiency or economy of operation, or extend the life of an existing fixed asset to a major degree.
The Architecture & Engineering Division manages projects that vary in complexity and scope. The Design Project Manager makes the final decision whether the HPBS apply on a project by project basis.
- All State Projects shall exceed the International Energy Conservation Code by 20% above the baseline or to the extent that is cost-effective over the life of the building or major renovation as determined by the Contracting Agency.
- All State Projects shall comply with the Owner’s Basic Requirements (OBR) described in the HPBS Exhibit A as well as comply with Article 1.3.A.
- All State Projects funded or authorized by the Legislature greater than $10,000,000 shall achieve a LEED Certification of a minimum Silver level or a Green Globes Rating of a minimum Two Globes rating or equivalent certification level in other Appropriate Standard as well as comply with Article 1.3.A. The Contracting Agency in conjunction with the Department may determine, on a project-by-project basis, if third-party certification or rating is not feasible or appropriate.
- If any requirements in this Article 1.3 are feasible for an applicable project and are attempted but not met, a post-project review shall be held to document the reasons why the requirement was not achieved. This document shall be archived in the final project closeout documents.
HPBP O&M-EB Funding Commitment Form
HPBP O&M-EB Program Participation Form
The voluntary HPBP for O&M-EB has been developed in collaboration with the Montana University System and other state agencies in order to improve the capacity of agencies to address operations, repairs, maintenance, and utility usage of existing state-owned facilities.
The goal of the HPBP for O&M-EB is to support existing state-owned buildings in meeting or exceeding operational standards that are cost-effective and enable progress toward sustainability in the following areas that form the basis of this HPBP:
- Optimizing energy performance
- Enhancing indoor environmental quality
- Conserving natural resources
- Improving productivity
- Reducing deferred maintenance backlogs
- Consistent/continual improvements to building functionality, durability, utilization, and maintenance
As part of the Long-Range Building Program, SB 43 of the 65th legislature directed the Department of Administration to compile and maintain a statewide facility inventory and condition assessment for LRBP-eligible buildings. FCAs are only required on LRBP-eligible buildings with a current replacement value greater than $300,000.
A Long-Range Building Program-eligible buildings is defined as:
A Building, Facility, or Structure Owned By a State Agency
- For which the Operation & Maintenance are funded with State General Fund money OR
- That supports academic missions of the University System and for which the Operation & Maintenance are funded with current Unrestricted University Funds
What is a Facility Condition Assessment?
A Facility Condition Assessment is a process that analyzes the physical condition and functionality of a facility and its equipment.
Why is a Facility Condition Assessment Important?
- To help optimize and maintain the physical condition of assets, prioritize resources, and develop capital budgets.
- To support an agency’s Long-Range Building Program requests to restore, replace, and maintain defective assets.
- To help prioritize projects that increase the efficiency of your facility’s operation and reduce the risk of downtime.
- To prioritize the items for maintenance and renewal based on accurate data rather than guesswork. Whether it’s repairing your HVAC system or replacing carpet, it helps agencies determine which assets are critical and those that can come further down the priorities list.
The A&E Division has selected Archibus for conducting condition assessments. Utilizing Archibus for FCAs will standardize the processes resulting in accurate and consistent asset data across the State portfolio.
In order to access Archibus, users need to request access. Contact Steve Faherty sfaherty@mt.gov (406) 422-2080 to set up an account.
Archibus Help Files
| Document | Description | Download |
|---|---|---|
| Archibus User Guide | Archibus user guide for FCAs | |
| FCA Assessment Form | PDF form that can be used to gather assessment data. | |
| Classification Code Descriptions | Detailed definitions for each building system classification code used in Archibus (A1010 Foundations, B2010 Basement Walls, etc.) | |
| Assessment Rating Guide |
Outlines how to assign system condition values using a 1–5 scale: Includes examples (e.g., B1010 Exterior Walls: Minor Repair = minor cracks, inconsequential water intrusion, repainting needed, flashing functional, monitor and schedule fixes). |
XLSX |
| Building Profiles for Archibus | Excel profiles for each building type. Each file shows the breakdown of the building into assessable systems, with classification codes assigned percentage values to represent their share of the overall structure. | ZIP |
Agency Forms
| Document | Description | Download |
|---|---|---|
|
Project Initiation Request |
Request a project using agency funds. |
|
| Consultant Appointment Request | Provide a list of 3 selected firms for appointment to a project. | |
| MUSAA-04 | Establish administrative appropriation |
About
GoaL
- Provide service based on current standards, best practices, and fiscal sustainability.
Objectives
- Draft and oversee contracts, following statutes and regulations, for design and construction of capital projects.
- Review appropriations annually to ensure authority is reverted to the appropriate fund balance in a timely manner.
- Provide agencies with essential and timely project budget information for agency monitoring and fiscal reporting requirements.
- Present to the legislature a single, comprehensive, and prioritized plan for capital construction.
Goal
- Emphasize efficiency, reliability, transparency, and leadership.
Objectives
- Complete construction projects within the time allotted in the contract and within the authorized budget.
- Advise the legislative and executive branches on the status of the Long-Range Building Program projects.
- Deliver buildings that are cost-effective, energy-efficient, affordable to maintain, and comply with current codes and standards.
- Advise on the funding levels necessary to maintain reasonable condition of state-owned facilities.
Goal
- Build and maintain relationships to support effective government.
Objective
- Use a team-based, collaborative approach with agencies, architects/engineers, and contractors to maximize communication and efficiency in the implementation of projects.
IT Goals
- Increase operational effectiveness and efficiency; continue to reduce analog and manual functions
- Promote the transparent and responsible management of public funds
- Enhance the availability of timely information for better decision-making; reduce the time lag between requests and responses
- Advance facility analysis, database, capital planning, and project management